Engineering & Environmental
The Golden Gate Bridge Physical Suicide Deterrent System Project will include preliminary engineering and environmental studies undertaken for the development of a potential physical suicide deterrent system on the Golden Gate Bridge.
The Project is divided into two phases:
Phase 1: Wind Tunnel Testing of Generic Suicide Deterrent Concepts - Fall 2006 to Spring 2007