Engineering & Environmental

 

The Golden Gate Bridge Suicide Deterrent System Study (Study) will include preliminary engineering and environmental studies undertaken for the development of a potential physical suicide deterrent system on the Golden Gate Bridge.  
 
The Study is divided into two phases:
 
Phase 1: Wind Tunnel Testing of Generic Suicide Deterrent Concepts - Fall 2006 to Spring 2007

Phase 2Preliminary Engineering and Environmental Studies - Summer 2007 to Late 2008

 

 